PMP Exam Simulator
3h 50m 0s
PMP exam lasts 230min and has 180 questions
Use acceleration to have extra 30m in reserve on exam
Quality Management
The project manager working on the construction project has performed a cost-benefit analysis. She is concerned about the high cost of nonconformance, or cost that will incur if proper quality level is not met in the project. All of the following are attributes of the cost of nonconformance EXCEPT: