You are the project manager of a project to install 2000 information booths for city hospitals. The booths will collect applications for credit cards, phone services, and other services. Large part of the project is focused on the information technology integration, the wide area network (WAN) connections from each booth, security of the data transferred, and the database of the information gathered. For the ease of management, you have hired local contractors to install the booths that you will deliver to each hospital. The contractors in each hospital will be responsible for the WAN connection, the electrical connection, the security of the booth and testing. The local contracted work could be called: